Revision list 2021.03.02 - plans matched grading plans 2021.03.02 - reduced front porch by 6", reduced the front porch overhang to 0" 2021.03.02 - issued drawings for zoning 2021.03.02 - issued drawigns for permit 2021.03.04 - Matched grading plans 2021.03.04 - removed sloped floor under basement stair, moved to allow for more head room height